Passenger Lift (1250 kg / 15 stops) BSB LIFT / MP YENER – TURKEY & ITALY

Passenger Lift (1250 kg / 15 stops) BSB LIFT / MP YENER – TURKEY & ITALY

৳ 3,100,000.00

/piece

Free Consultancy

Qty:
29520
x29520

Request For Quotation

Passenger Lift (1250 kg / 15 stops) BSB LIFT / MP YENER – TURKEY & ITALY













    Close

    Compare
    Product Code: 29520 Category:
    অর্ডার করার পূর্বে পণ্যের বর্তমান মূল্য ও স্টক ০৯৬১৭৭৭৮৮৭৭ নাম্বারে কল করে জেনে নিন।

    Description

    ELEVATOR  SPECIFICATIONS

    Capacity Floor/Stop System Roping Speed
    1250 Kg 15 MRL 2:1 1.6 m/sn
    1250 Kg 15 MR 2:1 1 m/sn

     

    Traction Machine Model Kw VVVF Travel
    MRL (A. SASSI) G300-T2 12 240-9 x 6.5 47000 mm
    MR   (A. SASSI) TORO 17.6 650 x 5 x 12 47000 mm

     

    Country of origin                : TURKEY  & ITALY

    Shipping port                        :“ISTANBUL”

    Security Standard              :EN 81.1 (European Safety Code)

    Shaft dimension (1)           :Width 2000(mm) X Depth-2600(mm) – MRL

    Shaft dimension (2)           :Width 2080(mm) X Depth-2600(mm) – MR

    Door dimension                  : width 900mm (For Center Opening) x Height 21000mm.

    Machine room                     : Direct above the shaft Location

    Overhead                               : 4000mm (Required)

    Pit                                             : 1500mm (Required)

    Machine Frame                  : Included

    Car Door                              : FERMATOR – 2P – 900X2000 HAIRLINE

    Landing Door                      : 2 panels Full Automatic, Main Landing door Wide jam, Stainless steel

    finished and all other landing doors also stainless steel  hairline finished

    Landing Door – Ground   : FERMATOR – 2P – 900X2000 HAIRLINE

    Landing Door – Other Fl.  : FERMATOR – 2P – 900X2000 HAIRLINE

    Car Model                           : BSB MAHI – 1275 kg.

    Car Walls                             : Decorative st. st.

    Car Accessories                  : Super Mirror st. st.

    Car Floor                              : Rosa Beta

    Car Ceiling                           : Laser cut with indirect lighting T-20 B

    Car Frame                            : Prog. Safety Gear + 2 pcs. Pulley (MRL) – 16P

    Overload                              : Electronically Overload (4)

    Photocell                             : Full Height

    Mirror                                  : Half Height

    Counterweight                   : Double Line + 1 pc. Pulley (MR) / (MRL)

    Fillings                                  : Special RCC – 600 mm.

    Separators Sheet               : Included

    Bracket                                : Included

    Car Guide Rail                    : 105 m Asray – 90x75x16 mm./B

    CW Guide Rail                    : 105 m Asray – 70x65x9 mm.

    N.B:  100% Straight, Non Rusted, Tempered Mild Steel For Heavy Duty , 10mm- Asray /European

    Car Rope                              : 544 m

    Governer Rope                   : 111 m

    (SEALS (Construction bright steel wires with fiber cores),- IZMIT CELIK A.S- European).

    COP LSPN 2000 – 15 ST. Hairline Full Height,  7 Segment
    LOP PSXT-251 , 7 Segment
    Floor Indicator N/A

     

    Controller                            : 15 kw A-Drive ARL-300 VVVF – RT Hi Tech-Arcode

    (3rd Generation-Turkey) Exclusive. Loop operative motherboard,

    VVVF with microprocessor. BSB (Turkey)

    Inverter                                : Mik-el (Turkey)

    Drive system                        : AC – VVVF (Variable Voltage Variable Frequency)

    • Smooth starting
    • Smooth stopping
    • Proper leveling
    • Savings of power consumption up to 50%
    • Longer life of equipment’s

     

    Speed Governor                     PFB–Turkish –European (An over speed governor is an elevator device

    Which act as a stop device in case the elevator runs beyond the rated speed. This device must

    Be installed in the traction elevators and roped hydraulic elevators.

     

    Exclusive Device (Optional):  A.R.D (Auto Rescue Device) 

    Additional fitting& Safety:  (1) Emergency light (2) Intercom system {3) Car lights & fans

    (4).Overload Devise (5) U.P.S. with 1.5 Hrs Power Back up.

       (6). Barger (talking) full set (7).Cabin& Counter Buffer. CENTA

      (8).Final Limit Switch & Bar Set and All Others EMAS. 

    • Evacuation :  During power failure the car will be manually moved to the nearest higher or

                                               Lower landing and the doors will be opened to facilitate evacuation of passengers.

     

    • Traveling cable Travel Cable – 36×075 

                                                         Flat l round type with required size and number in machine   room and the shaft

    • Car & counterweight guide : Special T – Guide rails machined to a high degree of fineness ensure the smooth running of the elevator.
    • Buffer (Car & Cw)  : HYDRAULIC – 1,6  

                                                If the car travels beyond the lowest floor or above the top floor the buffer reduces

                                                The shock of traveling cabin & counter weight frame at the bottom of the shaft.

    • Maintenance control :  Car stop station with an initiating switch, one up and one down button and one stop button.

     

    • Pre limit switch : When the magnetic conduct fail to take slow speed in top and bottom floor, there will have a pre limit switch (Electro mechanical switch) to help take slow speed in top and bottom floor and the lift stops smoothly in the floor level.
    • Final limit switch : If the car travels above top floor level or below bottom floor level it cuts off the main power of motor and stops functioning the lift.
    • Phase failure : If any phase of the main power supply is cut off (absent) , the protection switch does not provide supply to control circuit.               
    • Shaft Lighting Cable : 25 mt
    • Oil Pot                     : 4 Ps
    • Exclusive Device : A.R.D (Auto Rescue Device)
    • Emergency unlocking: All landing doors provide key system for emergency unlocking for landing for evacuation as well as for maintenance with a special key.

    Terms & Condition:

    DELIVERY:           The lift shall be Shipment and Delivered within 90 days from the date of L/C. As per Contact and payment schedule.

    INSTALLATION  & COMMISSIONING : The lift shall be installed and commissioned within 30 days ± 10 days from the date of delivery.

    EXCLUSIONS:

    MACHINEROOM CONSTRUCTION:  *Location direct above the shaft *Door for entrance of machine room * Hook for lifting at middle, *A fan for cooling *Arrangement of water proof * Trap door above the top floor.

    POWER ARRANGEMENT *Three phase line of 400 volts in machine room , *Necessary bus bar, ducking, MCB etc as per requirement for feeding power to the lift. * Circuit breaker in machine room and ground floor. *That the Purchaser shall make payment of the price of the lift as follows: 

    1. The supplier agrees to give the REPLASEMENT GUARANTY Of 05 (Five) Years (For Motor/Machine & Controller) And 01One Year Warranty Others Parts from the date of commissioning. Warranty covers replacement of any defective parts due to manufacturing defects and comes from bad workmanship. The warranty will not be enforceable if any parts become damage for ill handling & electrical over / low power supply.
    2. The Purchaser agrees to make ready the sites as follows:
    3. a) All civil work required to ready the shafts and machine rooms will be done by the Purchaser.
    4. b) The purchaser will provide electrical power fine of 400 volts, 3 phases, up to machine room, circuit breaker of 63 amps, and all electrical arrangements including MDB and SDB necessary for the lifts.
    5. c) The purchaser will provide a stare at site u1nder their own control to keep the materials ‘in a suitable condition.
    6. Free Servicing: 01 year from the date of trial run operation.
    7. That this agreement shall be executed in two counterparts, one for the Supplier and the

        other  for the Purchaser.

    1. That if due to Force Measure, such as war, invasion acts of god revolution, civil riots and acts of government, the performance if the agreement could not be carried out, the time for the performance of such obligation shall be extended for the period for which circumstances and their effects remains enforce.

     

    FINANCIAL OFFER

     Sample Price Structure

    OPTION-01 Description Price at BDT.
     1 Unit

        Lift.

    ( With ARD).

     BSB   Brand – Turkey, Passenger lift of 1250kg / 15stops,Car & Landing Doors- As Per Brand,1.0/1.6 m/s–Speed . Door –mechanism–Farmator-Turkey, Gear & motor– Alberto Sassi–   ITALY ,Guide rail- Asray – Turkey, Control – Hi Tech-Arcode 3rd Generation – Turkey/European .COP&LOP – L.E.D/ Digital –European

    NB: 100% Machineries will be imported.

     

    MR

    TOtal= 30,50,000

    Total= 31,00,000

     

    Price are including Govt, duty, tax, supply, installation, testing and commissioning.

     

    PAYMENT SCHEDULE ( For Intake)

    Installments Amount Payment date
    first 40%(Negotiable)  of sales value During signing the agreement to open the L.C
    Second 50%(Negotiable)  of sales value To retire the shipping documents from bank for custom clearance and also delivery the lift goods for ports.
    Third 05% of sales value During INSTALLATION & COMMISSION the materials at project for TEST RUN .
    Final 05% of sales value Within one month from the date of TEST RUN operation For Handover.

     

    On the above all, we are always at your service.

    Reviews

    There are no reviews yet.

    Be the first to review “Passenger Lift (1250 kg / 15 stops) BSB LIFT / MP YENER – TURKEY & ITALY”

    You may also like

    • Ronix Impact Drill 800w 13mm (2212)

      ৳ 2,650.00 /piece

      MOQ 1 Piece

      Add to cart Quick View
    X
    escort mersin